Abstract
The PIPE phase 2 project aims to building a customized system for galvanostatic passivation in field conditions and to optimize the surface treatment parameters. The PIPE phase 1 results have demonstrated solid milestones in the bench and the small-scale tests, and the scientific challenges are related to the integration of all system for an adequate field performance. The galvanostatic p…