Study of metaheuristic methods for project planning with resource constraints, job shop scheduling and multiobjective optimization

Grant number: 16/19238-5
Support Opportunities:Research Grants - Visiting Researcher Grant - International
Duration: November 18, 2016 - November 25, 2016
Field of knowledge:Interdisciplinary Subjects
Principal Investigator:Fabio Henrique Pereira
Grantee:Fabio Henrique Pereira
Visiting researcher: Jorge Jose de Magalhaes Mendes
Visiting researcher institution: Instituto Superior de Engenharia do Porto (ISEP), Portugal
Host Institution: Universidade Nove de Julho (UNINOVE). Campus Vergueiro. São Paulo , SP, Brazil

Abstract

The scheduling problem has been extensively studied due to its practical importance and computational complexity. Generally, the metaheuristic methods have been widely used for solving this kind of problem. However, despite there are sophisticated methods that can find good solutions for deterministic and relatively small problems, they maybe are not suitable to be applied in real medium and large problems, which are subject to randomness. Against this backdrop, this project proposes the development of Hybrid Multilevel version of the Genetic Algorithm method based on the creation of subspaces of the search space. The objective is to study techniques to project the problem in a suitable approximation subspace in order to reduce the size of the problem to be solved and the corresponding computational cost. Statistical and artificial intelligence techniques and discrete wavelet transform will be investigated. Specifically, the following two types of problems are addressed: 1) scheduling in a classic job shop, with n jobs and m machines, in which each job is processed on the machines according to a pre defined routes and deterministic processing times; 2) scheduling in a dynamic stochastic job shop environment, in which the production times and the time between arrivals of the jobs in the system are described by probability distributions. In both cases, the goal is to determine the production sequence in order to minimize the time to completion of all jobs in the production system (makespan). (AU)

Articles published in Agência FAPESP Newsletter about the research grant:
More itemsLess items
Articles published in other media outlets ( ):
More itemsLess items
VEICULO: TITULO (DATA)
VEICULO: TITULO (DATA)

Please report errors in scientific publications list using this form.
X

Report errors in this page


Error details: